bê tông sỏi nhẹ

BIM in Practice

Many of our users have been benefiting from BIM on some truly wonderful projects. It’s not easy to improve the world. These are some of the best at it.

Case Studies

 Learn more

 

 

Melbourne Rectangular Stadium

Organization: Arup
Location: Melbourne, Australia
Project Objective: Create a new sports complex for the city of Melbourne to host soccer and rugby matches.

Fast Facts:

  • Seating for 31,000
  • Unobstructed sight lines for fans
  • 50% less steel in roof vs. conventional stadium roof
  • Bio Frame roof based on the inherent structural efficiencies of the Buckminster Fuller geodesic dome
  • Structure will be clad in a triangular panelized façade made up of a combination of glass, metal, and louvers
  • Rain water harvesting system
  • Project completion date December 2009

 Learn more

 Wayne L. Morse US Courthouse 

Organization: Morphosis Architects
Location: Eugene, Oregon
Project Objective: Create a courthouse that aesthetically bridges the chasm between citizens and the government.

Fast Facts:

  • 267,000 square feet
  • Rating: U.S. Green Building Council LEED-NC, v.2/v.2.1-Level: Gold (39 points)
  • Top Ten Green Project for 2007 awarded by AIA Committee on the Environment
  • Increased time and cost saving using G

Learn more

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burgess & Niple

Organization: Burgess & Niple
Location: Columbus, Ohio
Project Objectives:

  • Provide various COS facility
    types for the US Army Corps of
    Engineers, which includes all necessary
    object intelligence resulting
    in an intelligent BIM deliverable.
  • Reduce change orders in the field
    by integrating all disciplines, and
    producing a more cohesive design
    through the collective of Bentley
    BIM applications and solutions.
  • Implement ProjectWise across
    the enterprise allowing multiple
    offices and contractors to have
    access to real-time BIM data.
  • Work with contractors and client
    to improve BIM implementation
    throughout entire project process.

Fast Facts:

  • Burgess & Niple fully integrated all
    disciplines through BIM applications,
    creating intelligent building types for
    the US Army Corps of Engineers.
  • A standardized USACE workspace
    improved design consistency and
    end product result, providing projects
    with better lifecycle management
    capabilities to the US Army Corps of
    Engineers.

Integrated conflict detection and
resolution employed throughout
design and construction processes.

 Learn more

 Achieving 5x ProjectWise ROI

Michael Baker Corporation got connected by ProjectWise. The goal: Create an environment to enable real-time collaboration – regardless of geographic location – for colleagues across 44 offices. The result: An independent analysis revealed a peak ProjectWise ROI of 5x from just one project.

 

 

 


 

 Learn more

Maximizing Employee Utilization
See how Barge Waggoner Sumner & Cannon is connecting people and information across project teams – no matter where they are located – to improve quality, reduce rework, and meet deadlines. By sharing work across its 12 offices, the firm increased profits by maximizing the efficiency of its workforce.

 

 

 

© 2006 MICAD SOFTWARE CO., LTD.
Address: 728-730 Vo Van Kiet St., Ward 1, District 5, HCM City
Tell: (84-28) 3922 5801 | Fax: (84-28) 3922 5805
Web:www.micad.com.vn | Email:info@micad.com.vn
Chuyên cung cấp bản quyền phần mềm (Software License) chính hãng
Partner of leading CAD_CAM_BIM Design Software Providers

tuan